Renewable Power Plant Water Systems

Power plants spend billions of dollars each year on water-based cooling costs. While effective and clean, evaporative cooling produces problematic vapor plumes and requires prohibitive amounts of water over time. Infinite Cooling is looking to solve all of those problems at once and strike a blow for sustainability with new innovative technology for renewable power plant water systems.

Our patented technology developed at MIT lets power plants of all different energy sources harvest the water from their cooling towers and reuse it, saving them 20% or more on water usage costs. You have the chance today to get in on the ground floor of the newest leap forward in energy cost solutions for power plants.

Why Everyone Is Talking About Our Power Plant Water Costs Solutions

The award-winning team of researchers and engineers at Infinite Cooling is getting ready to change the industry, one plant at a time. The winner of the MIT $100K Grand Prize and the MIT Clean Energy Prize, our technology will dramatically increase efficiency and lower water use for renewable power plant water systems.

Water Savings

20-30% reduction in total plant water consumption (make-up and blowdown).

Costs Savings

$1M annual savings in water sourcing and water treatment costs for a 600 MW system.

Plume Abatement

100% plume elimination on cooling towers retrofitted with Infinite Cooling technology.

Most power plants and factories with cooling towers don’t do anything with the water vapor released into the sky. And while clean, the plumes can cause perception problems and other setbacks with local property owners and permit-granting entities. Our system uses an electric field and a collecting system to eliminate that plume and let you reuse the water instead of just watching it float off.

The best part of our system is its flexibility and simplicity. For low costs, the system can be retrofitted and added to existing cooling towers and systems without disrupting operations or generating any risk for the power plant owner. And as it generates millions of dollars of savings as part of your power plant water costs solutions, we estimate power plant owners will be able to pay back their investment in just two years.

Maher Damak

Maher Damak

CEO & Co-Founder
Bio |

Karim Khalil

Karim Khalil

CTO & Co-Founder
Bio |

Kripa Varanasi

Kripa Varanasi

Chairman & Co-Founder
Bio |

Contact Us Now

Discover the new innovation at the cutting edge of renewable water systems for power plants. Qualified contacts should reach out to us online today.

info@infinite-cooling.com

 

444 Somerville Ave, Somerville MA 02143 | info@infinite-cooling.com

© Infinite Cooling Inc.